Abstract
Hybrid energy storage is considered as an effective means to improve the economic and environmental performance of integrated energy systems (IESs). Although the optimal scheduling of IES has been widely studied, few studies have taken into account the property that the uncertainty of the forecasting error decreases with the shortening of the forecasting time scale. Combined with hybrid energy storage, the comprehensive use of various uncertainty optimization methods under different time scales will be promising. This paper proposes a multi-time-scale optimal scheduling method for an IES with hybrid energy storage under wind and solar uncertainties. Firstly, the proposed system framework of an IES including electric-thermal-hydrogen hybrid energy storage is established. Then, an hour-level robust optimization based on budget uncertainty set is performed for the day-ahead stage. On this basis, a scenario-based stochastic optimization is carried out for intra-day and real-time stages with time intervals of 15 min and 5 min, respectively. The results show that
① the proposed method improves the economic benefits, and the intra-day and real-time scheduling costs are reduced, respectively; ② by adjusting the uncertainty budget in the model, a flexible balance between economic efficiency and robustness in day-ahead scheduling can be achieved; ③ reasonable design of the capacity of electric-thermal-hydrogen hybrid energy storage can significantly reduce the electricity curtailment rate and carbon emissions, thus reducing the cost of system scheduling.
Power generation and heat production efficiencies of gas turbine (GT) | |
Energy conversion efficiencies of gas boiler (GB) and electrolyzer (EL) | |
Energy conversion efficiencies of hydrogen fuel cell (HFC), electric chiller (EC), and absorption chiller (AC) | |
Charging and discharging efficiencies of electric energy storage (EES) | |
Charging and discharging efficiencies of thermal energy storage (TES) | |
Charging and discharging efficiencies of hydrogen energy storage (HES) | |
Carbon emission coefficients for renewable energy, natural gas netowrk, and grid | |
ГWT, ГPV | Uncertain budgets of wind and solar power forecasting errors |
Mean and standard deviation of wind power forecasting errors | |
Mean and standard deviation of solar power forecasting errors | |
Carbon tax price | |
The minimum and maximum power limits of EC | |
The minimum and maximum power limits of AC | |
Empirical values of wind and solar power forecasting errors at time t | |
Upper and lower limits of wind power forecasting errors | |
Upper and lower limits of solar power forecasting errors | |
The minimum and maximum power limits of HFC | |
The maximum charging and discharging power of HES | |
The minimum charging and discharging power of HES | |
Forecasting values of wind and solar power at time t | |
Down and up ramp rate limits of GT | |
The minimum and maximum power limits of GT | |
The maximum charging and discharging power of EES | |
The minimum charging and discharging power of EES | |
The maximum electric and gas input power from grid and natural gas network | |
Electricity price at time t and natural gas price | |
Penalty costs of abandoning wind and solar power | |
Operation and maintenance cost of equipment r, | |
The minimum and maximum power limits of EL | |
Electric, thermal, hydrogen, and cooling load power at time t | |
The minimum and maximum power limits of GB | |
The maximum charging and discharging power of TES | |
The minimum charging and discharging power of TES | |
Initial states of charge (stored energies) of EES, TES, and HES | |
The maximum and minimum stored energies of EES | |
The maximum and minimum stored energies of TES | |
The maximum and minimum stored energies of HES |
On/off status of GT at time t | |
Charging/discharging statuses of EES, TES, and HES at time t |
Power adjustment quantity for equipment r at time t | |
Energy purchase cost | |
Operation and maintenance cost | |
Electricity curtailment cost | |
Power adjustment cost | |
Output power of EC and AC at time t | |
Operating power of equipment r at time t, | |
Input power of GT, GB, and EL at time t | |
Input power of HFC, EC, and AC at time t | |
Charging and discharging power of HES at time t | |
Power generation and heat production of GT at time t | |
Charging and discharging power of EES at time t | |
Purchased electricity and gas power at time t | |
Output power of GB, EL, and HFC at time t | |
Charging and discharging power of TES at time t | |
Carbon tax revenue | |
Energy stored by EES, TES, and HES at time t |
Wind power forecasting error at time t | |
Solar power forecasting error at time t | |
Wind power at time t | |
Solar power at time t |
INTEGRATED energy system (IES) has garnered significant attention in recent years as an efficient, reliable, and environmentally friendly energy utilization solution [
In recent years, many scholars have studied the application of HESS in IES. Reference [
However, the aforementioned studies rarely consider optimal scheduling methods across different time scales. The dynamic operating characteristics and response times of various energy devices within an IES are significantly different. Additionally, different energy storage systems exhibit distinct power response behaviors. As a result, the benefits of more refined control and scheduling of these storage devices across various time scales have not been fully explored in the optimal scheduling process.
Multi-time-scale scheduling optimization achieves optimization and adjustment through the division into two or three stages (such as day-ahead, intra-day, and real-time), and it is also an effective approach to address the volatility of wind and solar power within IES [
In practical operations, robust optimization (RO), stochastic optimization (SO), and distributionally robust optimization (DRO) are the commonly used methods to address uncertainties such as those presented by renewable energy sources and load demands [
In summary, to address the shortcomings of existing studies, this paper proposes a multi-time-scale optimal scheduling method for the IES that considers the integration of EES, TES, and HES under wind and solar uncertainties. The method employs hybrid energy storage technologies and combines different optimization models to tackle renewable energy uncertainties under various time scales, aiming to enhance the overall economy and environmental friendliness of the system through optimal scheduling. Firstly, the proposed framework of IES with electric-thermal-hydrogen hybrid energy storage is established. Then, in response to the uncertainties of wind and solar power forecasting errors under long time scales (day-ahead) and short time scales (intra-day and real-time), RO scheduling model based on budget uncertainty set and SO scheduling model based on scenarios are proposed, respectively. Therefore, a multi-time-scale optimal scheduling method is put forward, which includes day-ahead RO, intra-day rolling SO, and real-time SO stages. Finally, the effectiveness of the proposed method is demonstrated through the case study, and the impacts of the uncertainty budget and hybrid energy storage on system benefits are analyzed.
The framework of the IES discussed in this paper is depicted in

Fig. 1 Framework of IES.
The operation of the IES is centrally managed by the dispatching center. After receiving the forecasting data for WT, PV, and various loads, the dispatching center sends dispatching signals to the various devices and the HESS within the IES to minimize scheduling costs and obtain the optimal scheduling plan. Additionally, the dispatching center is responsible for handling uncertainties during the optimization process, which will be described in detail in subsequent sections.
Considering that the forecasting errors of renewable energy power decreases as the forecasting time scale is shortend, this paper proposes a multi-time-scale optimal scheduling method based on three stages, i.e., day-ahead, intra-day, and real-time. The multi-time-scale optimal scheduling process is illustrated in

Fig. 2 Multi-time-scale optimal scheduling process.
1) Budget Uncertainty Set
In RO problems, the set space where uncertainty can occur is referred to as the uncertainty set. Using an appropriate representation of the uncertainty set is crucial for accurately assessing uncertainty. For classical RO problems, common representations of uncertainty sets include box, ellipsoidal, polyhedral, and budget sets. Each representation of the uncertainty set has its advantages and disadvantages, but the budget uncertainty set is constructed based on the relative values of uncertain parameter offsets, allowing for an accurate and straightforward description of the fluctuation of random variables [
Therefore, in this paper, we construct a budget uncertainty set to characterize the uncertainties of wind and solar power forecasting errors, with the constraint form represented as:
(1) |
(2) |
(3) |
(4) |
In this paper, we determine the boundaries of uncertain parameters by evaluating the intervals of historical data from the practical engineering. Subsequently, based on the budget uncertainty set, different ranges of uncertain parameters can be obtained through different values of Г. Adjusting Г allows for flexible control over the conservatism of the RO model solution.
Therefore, the power of wind and solar power can be expressed as:
(5) |
(6) |
2) Day-ahead Scheduling Model
The day-ahead scheduling aims to minimize the total scheduling cost of the IES. The objective function comprises four parts: energy purchase cost , operation and maintenance cost , electricity curtailment cost , and carbon tax revenue . The expression for this objective function is given as:
(7) |
(8) |
(9) |
(10) |
(11) |
In the scheduling process, each device needs to meet certain constraints during operation. The equipment operation constraints are given as:
(12) |
(13) |
(14) |
(15) |
(16) |
(17) |
(18) |
(19) |
(20) |
(21) |
(22) |
(23) |
(24) |
(25) |
Formulas (
The EES, TES, and HES all use state of charge (SOC) to indicate the energy they store. During operation, they must comply with energy constraints, power constraints, and the exclusivity constraints of charging/discharging. Additionally, within a scheduling period, they need to maintain a balance between charging and discharging. The operation constraints for these processes can be described as:
(26) |
(27) |
(28) |
(29) |
(30) |
where the superscript X denotes the name of the storage device, including EES, TES, and HES; E is the power of different energy flows, including electricity (P), heat (Q), and hydrogen (H); is the interval between scheduling periods; the subscript T denotes the end value of a scheduling cycle; and the subscript 0 denotes the initial value of a scheduling cycle.
In addition to the equipment operation constraints, the constraints of the day-ahead scheduling model also include energy balance constraints for electricity, heat, hydrogen, cooling, and natural gas, as well as constraints on wind and solar curtailment and energy purchase.
1) Energy balance constraints
(31) |
(32) |
(33) |
(34) |
(35) |
2) Wind and solar curtailment constraints
(36) |
(37) |
3) Energy purchase constraints
(38) |
(39) |
In summary, the day-ahead RO scheduling model can be summarized as:
(40) |
where x represent the decision variables in the day-ahead scheduling model, including continuous variables indicating the operating power of various equipment and binary variables indicating the on/off status of the equipment; represent the random variables denoting the wind and solar uncertainties, including and ; U represents the uncertainty set of the RO model, as described by (1) to (4).
According to (40), the optimal solution can be obtained under the worst case of day-ahead WT and PV output, thus ensuring the robustness of day-ahead scheduling plan.
1) Stochastic Scenario Set
The intra-day scheduling employs a scenario-based SO model. It generates a large number of initial scenarios for wind and solar power forecasting errors that satisfy specific probability distributions using Latin hypercube sampling (LHS). Subsequently, K-means clustering is applied to reduce the scenarios, resulting in a set of typical scenarios for wind and solar power forecasting errors, forming a stochastic scenario set. The detailed process refers to [
(41) |
(42) |
2) Intra-day Scheduling Model
The intra-day scheduling aims to minimize the total scheduling cost of the IES while minimizing power adjustments across various equipment as much as possible. The objective function incorporates the cost of equipment power adjustments in addition to the base of the prior scheduling.
(43) |
(44) |
The constraints of the intra-day scheduling model include equipment operation constraints, energy balance constraints, wind and solar curtailment constraints, and energy purchase constraints. Additionally, the startup and shutdown states of GT should adhere to the day-ahead scheduling plan.
In summary, the intra-day scheduling model can be summarized as follows:
(45) |
where represent the decision variables in the intra-day scheduling model, encompassing continuous variables denoting the operating power of each equipment and binary variables indicating the on/off status of the devices; and represent the random variables for wind and solar uncertanties, including and , which conform to the stochastic scenarios determined by (41) and (42).
Considering the short-term fluctuations in electricity demand and wind and solar power, it is necessary to make real-time power adjustments to electric generation units. This involves swiftly responding with EES and adjusting measures such as purchasing or curtailing electricity to address any imbalances in power. At this stage, the same SO approach used in the intra-day stage is applied, so further elaboration is unnecessary here.
It is worth noting that the objective function and constraints of the real-time scheduling model only involve variables related to electric generation units. The real-time scheduling model can be summarized as:
(46) |
where represent the decision variables in the real-time scheduling model, including continuous variables such as the operating power of EES, wind and solar curtailment, and electricity purchase, as well as binary variables indicating the charging and discharging status of EES; and represent the random variables for wind and solar uncertainties, including and , which comply with the stochastic scenarios determined by (41) and (42).
The IES of a demonstration project in a coastal area of China on a typical day in summer is selected as a case study for this paper, as shown in Supplementary Material A Fig. SA1. The forecasting data for renewable energy output and various loads are illustrated in Supplementary Material A Fig. SA2, while the parameters of the system equipment are presented in Supplementary Material A Table SAI. It is assumed in this paper that the wind power forecasting error follows a normal distribution with an expectation of 0, an intra-day standard deviation of 3%, and a real-time standard deviation of 2%. Similarly, the solar power forecasting error is assumed to be with an expectation of 0, an intra-day standard deviation of 2%, and a real-time standard deviation of 1%. The modeling is conducted using the RSOME [
In order to compare and verify the advantages of the proposed model, the following scheduling models are set up in this section for simulation calculation.
1) Model 1: conduct day-ahead RO, and directly use it as the final scheduling plan. The forecasting errors are balanced by the grid, wind curtailment, and solar curtailment.
2) Model 2: conduct day-ahead RO, and then adjust power through intra-day rolling SO and real-time SO to obtain the final scheduling plan, which is the model proposed in this paper.
3) Model 3: conduct day-ahead SO, and then adjust power through intra-day rolling SO and real-time SO to obtain the final scheduling plan.
It is worth noting that in Model 3, the day-ahead SO assumes that the forecasting errors of WT and PV power follow a normal distribution, with a standard deviation of 5% for WT and 3% for PV. The simulation results are shown in
Model | Scheduling cost (¥1 | |||||
---|---|---|---|---|---|---|
TSC | Cbuy | Com | Cadj | RCO2 | Ccut | |
1 | 1582.09 | 1409.98 | 206.55 | 0 | 53.95 | 19.51 |
2 | 1460.50 | 1284.89 | 207.54 | 12.16 | 61.26 | 17.17 |
3 | 1485.17 | 1297.54 | 207.13 | 25.83 | 63.11 | 17.78 |
By comparing Models 1 and 2, it can be observed that multi-time-scale scheduling can address day-ahead forecasting errors through intra-day and real-time power adjustments. Although Model 2 incurs additional power adjustment costs compared with Model 1, the overall cost of Model 2 is lower. This is because Model 1 can only rely on the grid and curtailment to balance day-ahead forecasting errors, whereas Model 2 can utilize local flexible resources such as GT for power adjustments. Additionally, due to the high carbon emission characteristics of the grid, the carbon tax revenue in Model 1 is also lower compared with that in Model 2.
By comparing Models 2 and 3, it is not difficult to find that in Model 3, the blind pursuit of economic efficiency at the day-ahead stage leads to increased intra-day and real-time adjustment costs. Additionally, the optimistic optimization approach in SO causes forecasting errors to be balanced by the grid and curtailment, resulting in higher energy purchase costs and curtailment costs compared with Model 2. This is detrimental to the operation of IES with a high proportion of renewable energy.
1) Day-ahead Scheduling Analysis
In the day-ahead stage, to address the uncertainty caused by wind and solar power forecasting errors, an RO model based on budget uncertainty set is employed to obtain the scheduling scheme for the previous day. The day-ahead optimal scheduling results are depicted in

Fig. 3 Day-ahead optimal scheduling results. (a) Electric energy balance. (b) Thermal energy balance. (c) Hydrogen energy balance. (d) Cooling energy balance.
2) Intra-day Scheduling Analysis
In the intra-day stage, based on the day-ahead plan, a rolling scheduling approach based on SO is employed, with the optimal scheduling results depicted in

Fig. 4 Intra-day optimal scheduling results. (a) Electric energy balance. (b) Thermal energy balance. (c) Hydrogen energy balance. (d) Cooling energy balance.
Due to inevitable discrepancies between short-term forecasting of wind, solar, and various loads and their prescheduled counterparts, adjustments to the power output of various devices are necessary throughout the intra-day rolling optimization process to ensure a balance between energy supply and demand.
Among these, EL and HFC, serving as flexible devices, exhibit considerable deviations in power output compared with the day-ahead results, aiming to fulfill the optimization objectives. Additionally, HESS involving EES, TES, and HES can be finely tuned at a 15-min time scale, thereby mitigating carbon emissions and reducing instances of curtailed power. The optimal scheduling results demonstrate the efficacy of the proposed method in adapting to the uncertainty of renewable energy power fluctuations and mitigating forecasting errors in short-term load forecasting.
3) Real-time Scheduling Analysis
In the real-time stage, the issue of unbalanced electric power (UEP) primarily stems from short-term forecasting errors in wind, solar, and electric loads. These forecasting inaccuracies can lead to mismatches in power supply and demand, posing challenges to the stable operation of the IES.
In the real-time stage, the IES mitigates the UEP by adjusting the charging and discharging rates of EES, increasing or decreasing the amount of electricity purchased from the grid, and appropriately adjusting curtailed wind and solar power. The real-time power adjustment results are depicted in

Fig. 5 Real-time power adjustment results.
Combining the optimal results across multiple time scales,
Stage | Scheduling cost (¥1 | |||||
---|---|---|---|---|---|---|
TSC | Cbuy | Com | Cadj | RCO2 | Ccut | |
Day-ahead | 1582.09 | 1409.98 | 206.55 | 0.00 | 53.95 | 19.51 |
Intra-day | 1495.30 | 1320.95 | 207.52 | 11.83 | 61.55 | 16.55 |
Real-time | 1448.67 | 1284.89 | 207.54 | 0.33 | 61.26 | 17.17 |
Additionally, the costs of purchasing electricity from the grid and gas from NG network constitute the largest portion of the total cost. In comparison to the day-ahead stage, the intra-day stage incurs additional operation costs and adjustment costs for equipment power. However, through flexible scheduling of HESS, the purchase cost significantly decreases, reducing the system reliance on the grid and NG. Meanwhile, carbon tax revenue increases by 14.09%, and electricity curtailment costs decrease by 15.17%.
In order to analyze the performance of the RO model in the day-ahead scheduling stage, the uncertainty budgets and in the budget uncertainty set for wind and solar forecasting errors were varied separately. The results of day-ahead TSC are shown in

Fig. 6 Day-ahead TSC under different uncertainty budgets for wind and solar power forecasting errors.
1) Comparison of Various Energy Storage Scenarios
To analyze the advantages of HESS, three different energy storage scenarios are set up in this part, as shown in
Scenario | EES | TES | HES |
---|---|---|---|
1 | √ | × | × |
2 | √ | √ | × |
3 | √ | √ | √ |
The results of the intra-day optimization in the three energy storage scenarios are presented in
Scenario | Scheduling cost (¥1 | |||||
---|---|---|---|---|---|---|
TSC | Cbuy | Com | Cadj | RCO2 | Ccut | |
1 | 1843.7 | 1519.50 | 185.21 | 3.40 | -6.73 | 128.86 |
2 | 1837.3 | 1484.49 | 185.26 | 4.37 | -34.32 | 128.86 |
3 | 1495.3 | 1320.95 | 207.52 | 11.83 | 61.55 | 16.55 |
2) Impact of HESS Capacity
The HESS capacity is a critical factor affecting the economic and environmental performance of the system. The carbon tax revenue, curtailment rate, and TSC under different capacity changes of energy storage device are obtained, as illustrated in

Fig. 7 Impact of energy storage capacity on scheduling cost. (a) Intra-day carbon tax revenue and curtailment rate. (b) Intra-day TSC.
Moreover, when the capacity reaches the designed level, the marginal benefits decrease significantly, further demonstrating the rationality of the capacity settings. Therefore, reasonably configuring the HESS capacity in IES can adapt to the wind and solar power uncertainties, reducing carbon emissions.
This paper establishes an IES model incorporating electric-thermal-hydrogen hybrid energy storage. It proposes a multi-time-scale optimal scheduling method comprising three stages: RO for day-ahead scheduling, rolling SO for intra-day scheduling, and real-time SO. Simulation results from the case study confirm the following conclusions.
1) With the multi-time-scale optimal scheduling method proposed in this paper, the total scheduling cost for the intra-day period decreases by 5.5% compared with the day-ahead period, and the total scheduling cost for real-time operations decreases by 3.12% compared with the intra-day period, demonstrating the effectiveness of the proposed method.
2) In the day-ahead stage, increasing the uncertainty budgets for wind and solar forecasting errors raises the total cost of robust optimal scheduling, with the most significant impact within the range of 0.2 to 0.5, beyond which the increase is slower, allowing decision-makers to balance economic efficiency and robustness.
3) The electric-thermal-hydrogen hybrid energy storage facilitates the flexible operation of IES and improves the economic and environmental benefits of IES. In addition to considering the marginal benefits, a reasonable design of HESS capacity is necessary.
Considering the flexibility resources on the user side of the IES, combined with integrated demand response, allowing hydrogen vehicles as hydrogen loads to respond to system scheduling, and exploring an optimized scheduling framework with multi-party collaboration will be the next research directions.
References
D. Song, W. Meng, M. Dong et al., “A critical survey of integrated energy system: summaries, methodologies and analysis,” Energy Conversion and Management, vol. 266, p. 115863, Aug. 2022. [Baidu Scholar]
Y. Luo, H. Hao, D. Yang et al., “Multi-objective optimization of integrated energy systems considering ladder-type carbon emission trading and refined load demand response,” Journal of Modern Power Systems and Clean Energy, vol. 12, no. 3, pp. 828-839, May 2024. [Baidu Scholar]
Y. Ma, H. Wang, F. Hong et al., “Modeling and optimization of combined heat and power with power-to-gas and carbon capture system in integrated energy system,” Energy, vol. 236, p. 121392, Dec. 2021. [Baidu Scholar]
Q. Li, X. Xiao, Y. Pu et al., “Hierarchical optimal scheduling method for regional integrated energy systems considering electricity-hydrogen shared energy,” Applied Energy, vol. 349, p. 121670, Nov. 2023. [Baidu Scholar]
F. Han, J. Zeng, J. Lin et al., “Multi-stage distributionally robust optimization for hybrid energy storage in regional integrated energy system considering robustness and nonanticipativity,” Energy, vol. 277, p. 127729, Aug. 2023. [Baidu Scholar]
M. Gao, Z. Han, C. Zhang et al., “Optimal configuration for regional integrated energy systems with multi-element hybrid energy storage,” Energy, vol. 277, p. 127672, Aug. 2023. [Baidu Scholar]
Q. Li, H. Wang, T. Wang et al., “Online diagnosis method of water management faults based on hybrid-frequency electrochemical impedance spectroscopy for PEMFC,” IEEE Transactions on Transportation Electrification, vol. 11, no. 1, pp. 2707-2716, Feb. 2025. [Baidu Scholar]
Q. Li, T. Su, L. Yin et al., “Health management for PEMFC system long-term operation based on optimal temperature trajectory real-time optimization,” IEEE Transactions on Industrial Electronics, doi: 10.1109/TIE.2024.3436539 [Baidu Scholar]
Y. Wang, Y. Zhang, L. Xue et al., “Research on planning optimization of integrated energy system based on the differential features of hybrid energy storage system,” Journal of Energy Storage, vol. 55, p. 105368, Nov. 2022. [Baidu Scholar]
C. Pan, H. Fan, R. Zhang et al., “An improved multi-timescale coordinated control strategy for an integrated energy system with a hybrid energy storage system,” Applied Energy, vol. 343 p. 121137, Aug. 2023. [Baidu Scholar]
Y. Zhu, Y. Xu, H. Chen et al., “Optimal dispatch of a novel integrated energy system combined with multi-output organic Rankine cycle and hybrid energy storage,” Applied Energy, vol. 343, p. 121113, Aug. 2023. [Baidu Scholar]
M. Fan, S. Cao, and S. Lu, “Optimal allocation of multiple energy storage in the integrated energy system of a coastal nearly zero energy community considering energy storage priorities,” Journal of Energy Storage, vol. 87, p. 111323, May 2024. [Baidu Scholar]
M. Gao, Z. Han, B. Zhao et al., “Optimal planning method of multi-energy storage systems based on the power response analysis in the integrated energy system,” Journal of Energy Storage, vol. 73, p. 109015, Dec. 2023. [Baidu Scholar]
H. Dong, Z. Shan, J. Zhou et al., “Refined modeling and co-optimization of electric-hydrogen-thermal-gas integrated energy system with hybrid energy storage,” Applied Energy, vol. 351, p. 121834, Dec. 2023. [Baidu Scholar]
L. Wang, J. Lin, H. Dong et al., “Demand response comprehensive incentive mechanism-based multi-time scale optimization scheduling for park integrated energy system,” Energy, vol. 270, p. 126893, May 2023. [Baidu Scholar]
Y. Qin, P. Liu, and Z. Li, “Multi-timescale hierarchical scheduling of an integrated energy system considering system inertia,” Renewable and Sustainable Energy Reviews, vol. 169, p. 112911, Nov. 2022. [Baidu Scholar]
G. Zhu and Y. Gao, “Multi-objective optimal scheduling of an integrated energy system under the multi-time scale ladder-type carbon trading mechanism,” Journal of Cleaner Production, vol. 417, p. 137922, Sept. 2023. [Baidu Scholar]
X. Ma, B. Peng, X. Ma et al., “Multi-timescale optimization scheduling of regional integrated energy system based on source-load joint forecasting,” Energy, vol. 283, p. 129186, Nov. 2023. [Baidu Scholar]
J. Tang, J. Liu, T. Sun et al., “Multi-time-scale optimal scheduling of integrated energy system considering demand response,” IEEE Access, vol. 11, pp. 135891-135904, Nov. 2023. [Baidu Scholar]
S. Yao, W. Gu, S. Lu et al., “Dynamic optimal energy flow in the heat and electricity integrated energy system,” IEEE Transactions on Sustainable Energy, vol. 12, no. 1, pp. 179-190, Jan. 2021. [Baidu Scholar]
R. Ma, J. Song, Y. Zhang et al., “Lifetime-optimized energy management strategy for fuel cell unmanned aircraft vehicle hybrid power system,” IEEE Transactions on Industrial Electronics, vol. 70, no. 9, pp. 9046-9056, Sept. 2023. [Baidu Scholar]
H. Ming, B. Xia, K. Lee et al., “Prediction and assessment of demand response potential with coupon incentives in highly renewable power systems,” Protection and Control of Modern Power Systems, vol. 5, no. 1, p. 12, Apr. 2020. [Baidu Scholar]
R. Xie, W. Wei, M. Li et al., “Sizing capacities of renewable generation, transmission, and energy storage for low-carbon power systems: a distributionally robust optimization approach,” Energy, vol. 263, p. 125653, Jan. 2023. [Baidu Scholar]
Y. Xiang, J. Liu, and Y. Liu, “Robust energy management of microgrid with uncertain renewable generation and load,” IEEE Transactions on Smart Grid, vol. 7, no. 2, pp. 1034-1043, Mar. 2016. [Baidu Scholar]
J. Yang and C. Su, “Robust optimization of microgrid based on renewable distributed power generation and load demand uncertainty,” Energy, vol. 223, p. 120043, May 2021. [Baidu Scholar]
M. Aslani, M. Mashayekhi, H. Hashemi-Dezaki et al., “Robust optimal operation of energy hub incorporating integrated thermal and electrical demand response programs under various electric vehicle charging modes,” Applied Energy, vol. 321, p. 119344, Sept. 2022. [Baidu Scholar]
Z. Ma, Y. Zhou, Y. Zheng et al., “Distributed robust optimal dispatch of regional integrated energy systems based on admm algorithm with adaptive step size,” Journal of Modern Power Systems and Clean Energy, vol. 12, no. 3, pp. 852-862, May 2024. [Baidu Scholar]
Y. Lian, Y. Li, Y. Zhao et al., “Robust multi-objective optimization for islanded data center microgrid operations,” Applied Energy, vol. 330, p. 120344, Jan. 2023. [Baidu Scholar]
M. Tostado-Véliz, A. R. Jordehi, L. Fernandez-Lobato et al., “Robust energy management in isolated microgrids with hydrogen storage and demand response,” Applied Energy, vol. 345, p. 121319, Sept. 2023. [Baidu Scholar]
R. Li, S. Guo, Y. Yang et al., “Optimal sizing of wind/concentrated solar plant/electric heater hybrid renewable energy system based on two-stage stochastic programming,” Energy, vol. 209, p. 118472, Oct. 2020. [Baidu Scholar]
R. Yan, Z. Lu, J. Wang et al., “Stochastic multi-scenario optimization for a hybrid combined cooling, heating and power system considering multi-criteria,” Energy Conversion and Management, vol. 233, p. 113911, Apr. 2021. [Baidu Scholar]
C. Shao, C. Feng, M. Shahidehpour et al., “Optimal stochastic operation of integrated electric power and renewable energy with vehicle-based hydrogen energy system,” IEEE Transactions on Power Systems, vol. 36, no. 5, pp. 4310-4321, Sept. 2021. [Baidu Scholar]
A. Mobasseri, M. Tostado-Veliz, A. A. Ghadimi et al., “Multi-energy microgrid optimal operation with integrated power to gas technology considering uncertainties,” Journal of Cleaner Production, vol. 333, p. 130174, Jan. 2022. [Baidu Scholar]
X. Xu, W. Hu, W. Liu et al., “Optimal operational strategy for a future electricity and hydrogen supply system in a residential area,” International Journal of Hydrogen Energy, vol. 47, no. 7, pp. 4426-4440, Jan. 2022. [Baidu Scholar]
Q. Meng, X. Jin, F. Luo et al., “Distributionally robust scheduling for benefit allocation in regional integrated energy system with multiple stakeholders,” Journal of Modern Power Systems and Clean Energy, vol. 12, no. 5, pp. 1631-1642, Sept. 2024. [Baidu Scholar]
Y. Wang, M. Song, M. Jia et al., “Multi-objective distributionally robust optimization for hydrogen-involved total renewable energy CCHP planning under source-load uncertainties,” Applied Energy, vol. 342, p. 121212, Jul. 2023. [Baidu Scholar]
Y. Wang, Y. Yang, H. Fei et al., “Wasserstein and multivariate linear affine based distributionally robust optimization for CCHP-P2G scheduling considering multiple uncertainties,” Applied Energy, vol. 306, p. 118034, Jan. 2022. [Baidu Scholar]
Q. Wu and C. Li, “Modeling and operation optimization of hydrogen-based integrated energy system with refined power-to-gas and carbon-capture-storage technologies under carbon trading,” Energy, vol. 270, p. 126832, May 2023. [Baidu Scholar]
F. Mei, J. Zhang, J. Lu et al., “Stochastic optimal operation model for a distributed integrated energy system based on multiple-scenario simulations,” Energy, vol. 219, p. 119629, Mar. 2021. [Baidu Scholar]
Z. Chen, M. Sim, and P. Xiong, “Robust stochastic optimization made easy with RSOME,” Management Science, vol. 66, no. 8, pp. 3329-3339, Aug. 2020. [Baidu Scholar]