Abstract
Although power grids have become safer with increased situational awareness, major extreme events still pose reliability and resilience challenges, primarily at the distribution level, due to increased vulnerabilities and limited recovery resources. Information and communication technologies (ICTs) have introduced new vulnerabilities that have been widely investigated in previous studies. These vulnerabilities include remote device failures, communication channel disturbances, and cyberattacks. However, only few studies have explored the opportunity offered by communications to improve the resilience of power grids and eliminate the notion that power-telecom interdependencies always pose a threat. This paper proposes a communication-aware restoration approach of smart distribution grids, which leverages power-telecom interdependencies to determine the optimal restoration strategies. The states of grid-energized telecom points are tracked to provide the best restoration actions, which are enabled through the resilience resources of repair, manual switching, remote reconfiguration, and distributed generators. As the telecom network coordinates the allocation of these resilience resources based on their coupling tendencies, different telecom architectures have been introduced to investigate the contribution of private and public ICTs to grid management and restoration operations. System restoration uses the configuration that follows a remote fast response as the input to formulate the problem as mixed-integer linear programming. Results from numerical simulations reveal an enhanced restoration process derived from telecom-aware recovery and the co-optimization of resilience resources. The existing disparity between overhead and underground power line configurations is also quantified.
IN the face of adversity posed by extreme events such as natural disasters, cyber-physical intrusions, and human errors, smart grids adhere to stringent standards of supply quality and service continuity. As a result, all stakeholders are committed to enhancing the reliability and resilience of the power grid [
Recent studies have introduced resilience-based optimization for grid restoration. Given their pivotal role, transmission networks have been at the forefront of these endeavors, serving as the backbone of power grids [
Current approaches for distribution system restoration (DSR) have ranged from single-resource optimization in the power grid to multi-resource co-optimization in interdependent systems. Investigated resources have primarily included reconfiguration switches, intervention crews, and mobile power storage. Reference [
For multi-resource DSR optimization, [
DSR invokes many power-telecom interdependent functions from outage management and wide-area monitoring, protection, and control systems, e.g., volt/var control, fault location, isolation, and service restoration (FLISR), and intervention workforce management [
These cutting-edge studies have considered one-way or no power dependence on communications, effectively narrowing the scope of the telecom network to its cyber layer alone. By contrast, practical evidence strongly demonstrates the importance of the physical layer of a telecom network, which can be affected by either physical damage or a shortage in the power supply [
1) The proposed restoration approach adeptly encapsulates the bidirectional interdependencies between power and telecommunications, along with the intricate coupling among restoration resources and the dynamics within the public-private telecom sectors.
2) A co-optimization is formulated to seek the optimal DSR strategies by leveraging the information on the availability of telecom assets and their power supply.
3) Various grid architectures are considered by the two broad families of overhead and underground lines, demonstrating the minimal model changes for configuration evolution.
4) A simplified formulation is used for radiality conditions, and a realistic multi-feeder network is constructed to validate the proposed restoration approach.
The remainder of this paper is organized as follows. Section II introduces the system model and proposed restoration approach. Section III presents simulations and numerical results. Section IV provides the conclusion of this paper.
Distribution grids are meshed by design but operate radially to limit the propagation of faults by opening switches during normal operation (called tie switches). The term “failure” is used interchangeably with fault, damage, outage, and incident to indicate the unavailability of a component due to an exogenous event.

Fig. 1 Summarized interactions between intra- and inter-domain components.
Following the outbreak of an extreme event, the fast response reconfigures the network by maneuvering the RCSs, relying on prior knowledge about the structure and operation of the grid as well as monitoring information. The entire process is conducted within a few minutes of the surge and typically allows for a partial restoration. The fast response comprises three phases. ① Automatic isolation: circuit breakers (CBs) associated with the affected feeders are automatically opened to protect the high-voltage (HV)/medium-voltage (MV) substations (SSs). Some overhead feeders contain automatic circuit reclosers (ACRs) that can limit the affected zone. ② Remote isolation: the wide automatically isolated zone is reduced by opening RCSs. Data from fault detectors are used to localize failures and open RCSs wherever they allow the isolation of nodes from damaged zones. ③ Reconfiguration: the achieved isolation is leveraged to restore loads. The topological, power flow, and zone isolation conditions are verified prior to any reconfiguration of the network. Please refer to [
Following the initial response, the SDG achieves a limited recovery that must be complemented by multiple resources: remote/manual switching, RCs/manual-switching crews (MCs), and DGs. An MILP formulation is proposed to co-optimize restoration resources, where the optimal combination of resilience resources, subject to topological, operational, and interdependency constraints, is sought. Co-optimization is motivated by the tight coupling of the considered resources. For instance, an intervention crew finishing a repair at a given line must inform the control center that the latter may execute a reconfiguration using switches before it commands the crew to reconnect the repaired segment. Similarly, microgrids formed using DGs combine the tasks achieved by specialized intervention crews and network reconfiguration by manual and remote switches. A complementarity also exists between the repair and placement of DGs, as zones that receive DGs can most likely afford the delayed repair, which allows other zones to be prioritized, and vice versa.
Inter-resource coupling is even more appealing when ICTs are recognized as vectors of coordination. Unlike the fast response, in which telecom points are affected only by direct failures, power shortages affect major telecom points after the depletion of batteries. Therefore, the DSR stage deals with bidirectional power-telecom interdependencies, where ICTs are dependent on the power grid for power supply, and the power grid is dependent on ICTs for controlling field assets and coordinating restoration strategies. The information provided to the DSR stage () includes remote reconfiguration from the first response and outage diagnoses. This is organized as a record of identified damages, estimation of travel/repair time, and indication of the accessibility of damaged sites.
Three zones can be distinguished during an event.
1) Damaged zone: part of the grid where the initial failure occurs and that sustains subsequent damage due to failure propagation.
2) Out-of-service safe zone: part of the grid initially included in the damaged zone but that could be isolated from damage using switches. Elements in this zone wait for reconnection to the grid.
3) Supplied safe zone: part of the grid that is safe from damage and energized.

Fig. 2 Fault propagation of two widely used topologies for overhead and underground lines. (a) Overhead. (b) Underground.
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
Constraint (1) ensures that damaged zones are not connected to safe (supplied or out-of-service) zones. This is guaranteed by the requirement for open lines between safe and damaged zones. A connection between supplied and out-of-service zones is possible. From (2) and (3), a power bus can be restored if no neighboring overhead or underground line is damaged () or if it is isolated from a neighboring underground line. The variable is directed because it represents the switch closest to node , and is the switch closest to node in underground lines. By contrast, the undirected variable is used when direction is not required. Constraints (4)-(6) state that an underground line is closed only when both switches are closed and is open otherwise. Except for constraints (3)-(6), the undirected variable is used throughout the model to represent the state of line .
A novel formulation is adopted to guarantee the radiality of the power grid:
(7) |
(8) |
(9) |
(10) |
(11) |
Constraint (7) imposes a unidirectional power flow while capturing the existence of unsupplied closed lines in damaged zones. This fact is missed in all the reviewed studies, as the equality sign in (7) would mean that energizing (de-energizing) a line is equivalent to closing (opening) it. Then, (8) and (9) state that for all , a line out of the damaged zones is safely energized as soon as it is closed. Note that the damage in a line is represented by the failure of directly connected nodes, implying that both failed-open and failed-closed events can be considered.
Constraint (10) prohibits the power flow into HV/MV SSs or nodes with a DG source and indicates that any other bus has at most one parent node. If the parent node does not supply power to the considered node , or is neither an SS nor a DG, then no downstream flow is possible from node , as encoded in (11). The placement of DGs to form islanded zones (or microgrids) is anticipated by (10), and the resulting topology is a spanning forest, similar to the case of a multi-SS power grid. This construction enables the formation of out-of-service islands.
The LinDistFlow model is used to represent the power flow for all loads.
(12) |
(13) |
(14) |
(15) |
(16) |
(17) |
(18) |
(19) |
(20) |
(21) |
Constraints (12) and (13) express the power balance of each bus. The difference in the node voltages is given in (14) in terms of power and impedance quantities ( is used here for linearization purposes, as it is the square of the actual node voltage). Constraints (15) and (16) limit the power capacity of closed lines, whereas (17) bounds the bus voltage. Unsupplied power is restrained by (18) and (19).
Grid operators use public and/or private communications for DSR and other grid applications [
Distribution system operators (DSOs) subcontract telecom operators to provide and manage the access and core infrastructure that enable SSs, field devices, and crews to connect to the control center and other central functions (DSO datacenters, procurement centers, billing systems, etc.). This subcontracting relationship has the advantages of reduced operational costs, wide coverage, and specialized support from experienced telecom teams. An alternative is to deploy a private network managed by a DSO to cope with privacy and congestion issues in public ICTs. Unfortunately, this imposes limitations such as a narrow bandwidth (i.e., reduced data rate), high operating expense (OPEX), niche technology, and very restricted ecosystem. These technologies encompass power line communications (PLCs), for which the DSO already has the basic infrastructure and private mobile radio (PMR) communications, operating in a dedicated frequency band.
A hybrid setting can be a good compromise between the advantages and disadvantages of public and private communications, where great flexibility exists for selecting a technology that meets the requirements of a given grid application [
1) Private or utility-owned APs (U-APs): these are major DSO assets equipped with large batteries. Each U-AP has a primary fixed (wired) link and a secondary wireless link in the case of a hybrid configuration. U-APs can provide RCSs and intervention crews with the requested TSs.
2) Telecom operator fixed APs (F-APs): these serve DSO assets (HV/MV SS and RCSs) in a public configuration, and can be a primary link for U-APs in a hybrid configuration. The battery can last for several hours.
3) Telecom operator wireless APs (W-APs): these serve the DSO assets (HV/MV SS and RCSs) in a public configuration and can be a secondary link for U-APs in a hybrid configuration. The battery can last for several hours.
The upper layer that serves the APs is called the core network, which collects, processes, and transmits data through technology-dependent aggregation points, location registers, and gateways. Some requests can be routed directly at the core level, whereas in the case of DSR, other requests resort to the central functions of power grid such as the control center. The core network connects to the WAN of the utility, which is a collection of routers, switches (communication switches), and various networking equipment that grant access to grid functions and applications. The criticality associated with WANs has caused most power operators to deploy their own networks, which may or may not be handed over to a tier telecom operator for management [
(22) |
(23) |
(24) |
(25) |
(26) |
(27) |
(28) |
The cross sign between different sets is used to represent the indexed sets in which only meaningful elements are evaluated. In other words, does not contain all possible two-dimensional combinations formed by the elements of the two sets but includes only the valid pairs formed by an SS connected to a W-AP .
In (22), the summation over all W-APs associated with SS shows the redundancy offered by W-APs, which is not found in fixed networks (dedicated wired links). The TS available to an HV/MV SS depends on the availability of either an F-AP or a secondary W-AP. Although common, this is a generic choice for connecting SSs, and (22) is easily adaptable to other technologies. A hybrid public/private telecom architecture in which private assets eventually send and receive data through public networks is expressed in (23). Constraints (24) and (25) emphasize that the TS is available only when the power supply is guaranteed by the power grid or backup batteries. In this case, the HV/MV SSs and U-APs will not necessarily fail but will operate in blind mode.
In (26), the binary variable is linked to to indicate whether the battery of the AP is empty ().
Damage assessment is conducted by diagnostic crews, helicopter-transport teams, and aerial drones [
We adopt the node-centered approach proposed and demonstrated in [
(29) |
(30) |
(31) |
(32) |
(33) |
According to (29), a crew is at a maximum of one node (a damaged line or depot) at any given , and traveling time of at least and would be required for an RC and MC, respectively, to go from to . From (30), no isolation crew can visit an incident at any after being visited by an RC. Constraint (31) shows that a line is repaired when an RC and MC spend sufficient time at the node, starting with to manually isolate the damaged site and then for the repair, before spending in reconnecting the restored line. RCs can perform manual switching. A depot can handle only a limited amount of damage (32). In (33), the damaged line is in one of the four following states at any time step: not yet visited, in isolation, under repair, or resolved.
(34) |
(35) |
(36) |
(37) |
Unlike the routing of RCs and MCs, GCs must return to the depot after completing each task. This is based on the assumption that the considered DGs are truck-mounted and bulky, requiring an entire team for transport and installation. In (34), a crew is at a maximum of one node (a DG candidate or depot) at any given time . The traveling time of at least is required between a node and its depot ( is used to indicate that a crew is returning from or heading to its depot). Constraint (35) enforces that no direct paths between the DG candidates are allowed. A DG is placed after a crew spends at least a placement time at a site , as indicated in (36). From (37), a candidate node either has yet to be visited, is undergoing DG placement, or has a DG installed.
The first power-telecom dependence is revealed in (24) as the power grid energizes APs, making the TS available only when the physical equipment is up and running. Executing commands received by power grid assets presents another power-telecom dependence, where the power flow is regulated by the applied controls.
(38) |
(39) |
(40) |
Before switching, a line must be available for connection, which is conditioned in (38) by the status of the communication AP. Constraint (39) implies the dependence of RCSs and ACRs on TSs from U-APs. From (40), a CB operates only when TSs from an SS are available. The nonlinear square terms in (39) and (40) are easily linearized.
(41) |
The interdependencies are also manifested between resilience resources. Constraints (31) and (36) already express that a line and DG are not operable unless the missioned crews have completed their tasks. In addition, the closest manual lines are first opened for the best isolation and then closed after task completion (41). The dependence of U-APs on public ICTs is represented in (23), which can be expanded to model other dependencies based on chosen hybrid architectures.
For applicability to DSR, such as the exchange of assets and real-time data on the state of mutually supplying nodes, this interdependency analysis requires close collaboration between power and telecom operators [
During an extreme event, it is the primary goal of a utility to recover power supply as quickly as possible to the maximum number of clients. In this paper, supplied power (or, conversely, unsupplied power) is adopted as a performance measure and used in the objective function of the formulated MILP problem. This is in addition to costs related to deployed resilience resources.
(42) |
DSOs do not spare restoration efforts because of pressure from governments, regulatory bodies, public opinion, and operator commitment. Thus, the weighting coefficients are interrelated such that and , meaning that costs are only significant in cases of equivalent performance of restoration strategies. Switching costs are introduced because no change in the configuration is desired unless there is a gain in the restored power or damage isolation. is considered the same for all operated switches, and a binary variable is introduced for the linearization of .
(43) |
(44) |
where equals if the switch at line is toggled (opened or closed) at ; otherwise, it equals 0.
Multi-feeder systems are constructed to validate the proposed restoration approach. Per-phase analysis is run in 20 kV balanced grids. We set , and . The model is implemented in Pyomo and solved using CPLEX on a computer with an Intel Core i7 (2.5 GHz) and 32 GB of RAM.

Fig. 3 36-bus system with a total demand of 1305 kW and service telecom points.
Set | Power line |
---|---|
1-4, 1-6, 1-8, 2-15, 2-17, 2-19, 3-26, 3-28, 3-30 | |
19-20 | |
8-9, 22-35, 20-22, 14-33, 23-24, 31-33, 12-13, 10-24, 5-18, 9-11, 11-25, 20-21, 4-5, 26-27, 30-31, 13-32, 7-27, 21-36, 19-23, 19-29 | |
9-10, 30-34, 30-36, 6-7, 31-32, 17-18, 28-29, 8-12, 8-14, 34-35, 19-25, 15-16 | |
1-6, 6-7, 9-10, 19-23, 23-24, 30-31, 31-32, 30-36 |
A scenario of eight instances of damage is considered, with seven affected power lines and one telecom AP ( damaged during the entire period). Following the occurrence of events, the total supplied power drops from 100% in the initial phase to 29.5% after degradation, then increases with the RCS-based reconfiguration. As expected, the hybrid overhead-underground grids perform better than the full-overhead grids with 48.66% and 42.91% of the supplied power, respectively. Nevertheless, both cases are far from acceptable levels of restoration due to the limited improvement brought by remote switches. Thus, the distribution operators append other resources to subsequent restoration steps.
The resulting grid configuration is considered as the initial state () of the restoration process for which a time step of 1 hour is used. Under the distance-based optimization model described in [
A preliminary simulation is conducted to confirm the intuitive statement, which is well-verified in previous studies, that co-optimization achieves a better performance than non-cooperative approaches. Considering perfect communications (Case 1), we obtain a 12% gain in the total supplied load using the proposed co-optimization (as compared with the first case of separate optimization problems for reconfiguration and crew schedules [
Next, to quantify the criticality of TSs in the SDGs, a telecom-agnostic case is constructed (Case 2). This corresponds to a scenario in which restoration decisions are made without giving special attention to the status of telecom points. To accomplish this, the problem is solved first under perfect communications (Case 1). Then, the obtained solution of crew allocation (sequence of dispatching crews) is used as a parameter to solve the formulated problem for the remaining variables of telecom and switch states as well as power quantities. The proposed restoration approach, which leverages the state of the telecom points to find a restoration strategy, is referred to as telecom-aware (Case 3).
The evolution of the supplied power during the DSR stage in the three cases is shown in

Fig. 4 Evolution of supplied power during DSR stage.
For the hybrid configuration, the ideal case of perfect communication achieves the best restoration compared with Cases 2 and 3 but can be described as overly optimistic because the ICTs are not perfect and undergo many failures. Cases 2 and 3 are more realistic because they include telecom failures, which are exploited in the proposed restoration approach (Case 3) to orient restoration choices and achieve a better recovery than that in Case 2, which does not link resource allocation to the state of telecom APs. A similar trend is observed in the overhead configuration. Here, the curve associated with Case 1 dominates the telecom-aware and telecom-agnostic cases, whereas the importance of prioritizing supply restoration to a few critical telecom points (which are useful for subsequent restoration) is demonstrated in Case 3, which outperforms Case 2.

Fig. 5 Intervention crew schedules in Cases 2 and 3 for an overhead configuration. (a) Case 2. (b) Case 3.
The timelines show that RCs operate manual switches after finishing their tasks, as they are already on site; this is in accordance with control center instructions. Post-repair manual switching is depicted by retaining RCs at the damage site for longer than the repair time, which is set to be two hours in this paper. In addition, battery discharging information at telecom APs is used in Case 3 to delay sending crews ( and ) to their respective tasks, because opportunities for reconfiguration are blocked by the absence of the TS and are conducted only following the restoration of a portion of the TS at the hour. This postponement of intervention allows another task to be assigned to the crew and avoids the cost of waiting at damage sites until TS recovery.
Case | Time (hour) | W1, U1, U3, SS2 | X2, W2, U2, SS1, SS3 |
---|---|---|---|
2 | 0→2 | TS up | TS up |
3→9 | TS down | TS down | |
10→13 | TS up | TS down | |
14→15 | TS up | TS up | |
3 | 0→2 | TS up | TS up |
3→7 | TS down | TS down | |
8→10 | TS up | TS down | |
11→15 | TS up | TS up |

Fig. 6 Major steps in DSR for full-overhead configuration in Case 3. (a) Hours 0→4. (b) Hours 5→7. (c) Hours 8→10. (d) Hours 11→14. (e) Hour 15.
In
In
In
In
In
Two case studies with 141- and 315-bus systems are constructed from a real MV power grid to demonstrate the applicability of the proposed restoration approach to larger-scale power grids (27 and 59 MW load power, respectively). Unlike most systems in which manual switches are ignored and very few remote switches are analyzed, a switch (remote or manual) is considered at each line. A scenario of 10 failures is considered, where three depots host the restoration resources: , , . For an overhead configuration, the DSR is solved in 225.3 and 267.4 s under the two 141-bus and 315-bus systems, respectively. The results presented in

Fig. 7 Evolution of supplied power during DSR. (a) 141-bus system. (b) 315-bus system.
Finally, the main modeling contribution of this paper, which considers two-way power-telecom interdependencies in an SDG, is used in other practical applications such as new deployments of remote switches, crew sizing, and definitions of power-telecom service-level agreement (SLA) [
The restoration process in SDG is modeled by integrating power-telecom interdependencies and considering multiple resources. The reconfiguration of switches, RCs/MCs, and DGs is coordinated by means of a telecom-aware MILP co-optimization process, which yields improved resilience strategies. The advantages of tight damage isolation are revealed through an exploration of general cases of underground and overhead electrical networks. The proposed restoration approach incorporates both the contribution of communication networks to DSR (by connecting remote switches and field crews to central grid functions) and the power supply of telecom assets for a comprehensive analysis of bidirectional power-telecom interdependencies. The results of the case studies demonstrate that the co-optimization of resource allocation and telecommunications-aware strategic interventions enhances the DSR and improves the overall resilience of the grid. The application of the proposed restoration approach to real smart distribution grids validates its applicability.
Future studies will involve a more detailed model with increased accuracy for DGs, battery storage, load, and telecom dynamics. This is expected to increase the computational burden, which will necessitate the development of a lower-complexity solution algorithm.
Nomenclature
Symbol | —— | Definition |
---|---|---|
A. | —— | Sets |
—— | Set of crews | |
—— | Set of candidate nodes to receive a distributed generator (DG) and set of nodes that DG placement crews visit (candidate nodes and depots) | |
—— | Set of depots | |
—— | Set of damaged power lines | |
—— | Sets of damaged overhead and underground lines | |
—— | Set of nodes of damaged lines and depots | |
—— | Set of DG placement crews | |
—— | Sets of all lines and underground lines | |
—— | Sets of auto-reclosing and circuit-breaking lines | |
—— | Sets of manual and remote switchable lines | |
—— | Set of all power nodes | |
—— | Set of neighbor nodes of node | |
—— | Set of neighbor manual lines of line | |
—— | Sets of repair and manual switching crews | |
—— | Set of high-voltage (HV)/medium-voltage (MV) substations (SSs) | |
—— | Set of utility-owned access points | |
—— | Sets of fixed and wireless access points | |
B. | —— | Parameters |
—— | Weighting coefficients | |
—— | Non-supplied load, switching, repair, manual-switching, and DG placement costs | |
—— | Number of crews | |
—— | The maximum energy storage of battery at node | |
—— | Binary parameter that equals 1 if telecom point i fails, and 0 otherwise | |
—— | Number of nodes (damaged lines and depots) | |
—— | DG placement time at bus | |
—— | Large number | |
—— | Active battery discharging power of node | |
—— | Total active, reactive, and apparent power demands | |
—— | The maximum active and reactive DG power | |
—— | Resistance and reactance of line | |
—— | Demand of repair resource from faulted line | |
—— | Repair resource available at depot | |
—— | Repair time and manual switching time of faulted line | |
—— | Binary parameter that equals 1 if is an SS, and 0 otherwise | |
—— | Number of restoration time steps | |
—— | Travel time from to (depot, line, or bus) | |
C. | —— | Variables |
—— | 1 if line is available at time , and 0 otherwise | |
—— | 1 if bus is available at time , and 0 otherwise | |
—— | 1 if a DG is available at bus at time , and 0 otherwise | |
—— | Arrival time of crew to damaged line | |
—— | 1 if battery at bus is not empty at time , and 0 otherwise | |
—— | Binary variables describing crew traveling from to m and crew visiting | |
—— | 1 if power flows on line at time , and 0 otherwise | |
—— | Energy storage of battery at node at time | |
—— | 1 if bus is under DG-placement by crew of depot at time , and 0 otherwise | |
—— | 1 if line is under manual switching by crew of depot at time , and 0 otherwise | |
—— | 1 if switch on line is closed at time , and 0 otherwise | |
—— | Active and reactive power flows of line at time | |
—— | Losses of active and reactive loads at node at time | |
—— | Active and reactive DG power at node at time | |
—— | 1 if line is under repair by crew of depot at time , and 0 otherwise | |
—— | 1 if the telecom service of an SS is available at time , and 0 otherwise | |
—— | 1 if directed switch on line is closed at time , and 0 otherwise | |
—— | 1 if the telecom service from operator’s access point is available at time , and 0 otherwise | |
—— | 1 if electricity supply for operator’s access point is available at time , and 0 otherwise | |
—— | 1 if telecom service from utility-owned access point is available at time , and 0 otherwise | |
—— | Voltage magnitude at node at time | |
—— | Linearization binary variables | |
—— | 1 if bus is energized at time , and 0 otherwise | |
—— | 1 if a DG is connected at bus at time , and 0 otherwise | |
D. | —— | Vectors |
—— | Vector of availabilities of power buses, lines, or DGs | |
—— | Vector of all intervention crews | |
—— | Vector of power flow directions | |
E | —— | Vector of state-of-charge and depletion status of batteries |
p | —— | Vector of electrical quantities (active/reactive power and node voltages) |
sw | —— | Vector of switch statuses |
—— | Vector of electrical and telecom statuses of all telecom points | |
—— | Vector of linearization variables | |
y | —— | Vector of connectivities of buses to power grid or DGs |
REFERENCES
Z. Bie, Y. Lin, G. Li et al., “Battling the extreme: a study on the power system resilience,” Proceedings of the IEEE, vol. 105, no. 7, pp. 1253-1266, Jul. 2017. [Baidu Scholar]
Y. Wang, C. Chen, J. Wang et al., “Research on resilience of power systems under natural disasters‒a review,” IEEE Transactions on Power Systems, vol. 31, no. 2, pp. 1604-1613, Mar. 2016. [Baidu Scholar]
Y. Liu, R. Fan, and V. Terzija, “Power system restoration: a literature review from 2006 to 2016,” Journal of Modern Power Systems and Clean Energy, vol. 4, no. 3, pp. 332-341, May 2016. [Baidu Scholar]
J. Liu, Y. Yu, and C. Qin, “Unified two-stage reconfiguration method for resilience enhancement of distribution systems,” IET Generation, Transmission & Distribution, vol. 13, no. 9, pp. 1734-1745, May 2019. [Baidu Scholar]
Q. Zhou, D. Shirmohammadi, W.-H. E. Liu, “Distribution feeder reconfiguration for service restoration and load balancing,” IEEE Transactions on Power Systems, vol. 12, no. 2, pp. 724-729, May 1997. [Baidu Scholar]
P. Van Hentenryck and C. Coffrin, “Transmission system repair and restoration,” Mathematical Programming, vol. 151, no. 1, pp. 347-373, Mar. 2015. [Baidu Scholar]
Y. P. Fang and G. Sansavini, “Optimum post-disruption restoration under uncertainty for enhancing critical infrastructure resilience,” Reliability Engineering & System Safety, vol. 185, pp. 1-11, May 2019. [Baidu Scholar]
G. Kandaperumal and A. K. Srivastava, “Resilience of the electric distribution systems: concepts, classification, assessment, challenges, and research needs,” IET Smart Grid, vol. 3, no. 2, pp. 133-143, Apr. 2020. [Baidu Scholar]
S. Poudel and A. Dubey, “A two-stage service restoration method for electric power distribution systems,” IET Smart Grid, vol. 4, no. 5, pp. 500-521, Oct. 2021. [Baidu Scholar]
N. Morshedlou, A. D. Gonzalex, and K. Barker, “Work crew routing problem for infrastructure network restoration,” Transportation Research Part B: Methodological, vol. 118, pp. 66-89, Dec. 2018. [Baidu Scholar]
R. Perez-Guerrero, G. T. Heydt, N. J. Jack et al., “Optimal restoration of distribution systems using dynamic programming,” IEEE Transactions on Power Delivery, vol. 23, no. 3, pp. 1589-1596, Jul. 2008. [Baidu Scholar]
C. Wang, P. Ju, S. Lei et al., “Markov decision process-based resilience enhancement for distribution systems: an approximate dynamic programming approach,” IEEE Transactions on Smart Grid, vol. 11, no. 3, pp. 2498-2510, May 2020. [Baidu Scholar]
M. M. Hosseini and M. Parvania, “Resilient operation of distribution grids using deep reinforcement learning,” IEEE Transactions on Industrial Informatics, vol. 18, no. 3, pp. 2100-2109, Mar. 2022. [Baidu Scholar]
A. Arif, Z. Wang, J. Wang et al., “Power distribution system outage management with co-optimization of repairs, reconfiguration, and DG dispatch,” IEEE Transactions on Smart Grid, vol. 9, no. 5, pp. 4109-4118, Sept. 2018. [Baidu Scholar]
S. Lei, C. Chen, Y. Li et al., “Resilient disaster recovery logistics of distribution systems: co-optimize service restoration with repair crew and mobile power source dispatch,” IEEE Transactions on Smart Grid, vol. 10, no. 6, pp. 6187-6202, Nov. 2019. [Baidu Scholar]
Y. Bian, C. Chen, Y. Huang et al., “Service restoration for resilient distribution systems coordinated with damage assessment,” IEEE Transactions on Power Systems, vol. 37, no. 5, pp. 3792-3804, Sept. 2022. [Baidu Scholar]
W. Liu, Z. Lin, F. Wen et al., “A wide area monitoring system based load restoration method,” IEEE Transactions on Power Systems, vol. 28, no. 2, pp. 2025-2034, May 2013. [Baidu Scholar]
A. Ashok, M. Govindarasu, and J. Wang, “Cyber-physical attack-resilient wide-area monitoring, protection, and control for the power grid,” Proceedings of the IEEE, vol. 105, no. 7, pp. 1389-1407, Jul. 2017. [Baidu Scholar]
S. Xin, Q. Guo, H. Sun et al., “Information-energy flow computation and cyber-physical sensitivity analysis for power systems,” IEEE Journal on Emerging and Selected Topics in Circuits and Systems, vol. 7, no. 2, pp. 329-341, Jun. 2017. [Baidu Scholar]
G. Huang, J. Wang, C. Chen et al., “Cyber-constrained optimal power flow model for smart grid resilience enhancement,” IEEE Transactions on Smart Grid, vol. 10, no. 5, pp. 5547-5555, Sept. 2019. [Baidu Scholar]
Z. Ye, C. Chen, R. Liu et al., “Boost distribution system restoration with emergency communication vehicles considering cyber-physical interdependence,” IEEE Transactions on Smart Grid, vol. 14, no. 2, pp. 1262-1275, Mar. 2023. [Baidu Scholar]
X. Liu, B. Zhang, B. Chen et al., “Towards optimal and executable distribution grid restoration planning with a fine-grained power-communication interdependency model,” IEEE Transactions on Smart Grid, vol. 13, no. 3, pp. 1911-1922, May 2022. [Baidu Scholar]
X. Wang, Q. Kang, J. Gao et al., “Distribution network restoration supply method considers 5G base station energy storage participation,” Energy, vol. 289, p. 129825, Feb. 2024. [Baidu Scholar]
A. Kwasinski, W. W. Weaver, P. L. Chapman et al., “Telecommunications power plant damage assessment for hurricane Katrina – site survey and follow-up results,” IEEE Systems Journal, vol. 3, no. 3, pp. 277-287, Sept. 2009. [Baidu Scholar]
S. A. Fenrick and L. Getachew, “Cost and reliability comparisons of underground and overhead power lines,” Utilities Policy, vol. 20, no. 1, pp. 31-37, Mar. 2012. [Baidu Scholar]
O. Al-Khatib, W. Hardjawana, and B. Vucetic, “Traffic modeling and optimization in public and private wireless access networks for smart grids,” IEEE Transactions on Smart Grid, vol. 5, no. 4, pp. 1949-1960, Jul. 2014. [Baidu Scholar]
E. Ancillotti, R. Bruno, and M. Conti, “The role of communication systems in smart grids: architectures, technical solutions and research challenges,” Computer Communications, vol. 36, no. 17-18, pp. 1665-1697, Nov. 2013. [Baidu Scholar]
Q. Yang, J. A. Barria, and T. C. Green, “Communication infrastructures for distributed control of power distribution networks,” IEEE Transactions on Industrial Informatics, vol. 7, no. 2, pp. 316-327, May 2011. [Baidu Scholar]
V. C. Gungor, D. Sahin, T. Kocak et al., “Smart grid technologies: communication technologies and standards,” IEEE Transactions on Industrial Informatics, vol. 7, no. 4, pp. 529-539, Nov. 2011. [Baidu Scholar]
M. Kuzlu, M. Pipattanasomporn, and S. Rahman, “Communication network requirements for major smart grid applications in HAN, NAN and WAN,” Computer Networks, vol. 67, pp. 74-88, Jul. 2014. [Baidu Scholar]
D. C. Paraskevopoulos, G. Laporte, P. P. Repoussis et al., “Resource constrained routing and scheduling: review and research prospects,” European Journal of Operational Research, vol. 263, no. 3, pp. 737-754, Dec. 2017. [Baidu Scholar]
U.S. Department of Energy, “Electric power telecommunications interdependencies,” Tech. Rep., U.S. Department of Energy, 2023. [Baidu Scholar]
IEEE Guide for Smart Grid Interoperability of Energy Technology and Information Technology Operation with the Electric Power System (EPS), End-use Applications, and Loads, IEEE Standard 2030-2011, 2011. [Baidu Scholar]
Management and Orchestration: Network and Services Operations for Energy Utilities, 3GPP Specification 28.318, 2024. [Baidu Scholar]
Y. N. Belaid, “Integrated power-telecom modeling for resilience quantification and optimization in smart distribution grids,” Ph.D. dissertation, University of Paris-Saclay, Paris, France, Sept. 2023. [Baidu Scholar]