Journal of Modern Power Systems and Clean Energy

ISSN 2196-5625 CN 32-1884/TK

Accommodation of Curtailed Wind Power by Electric Boilers Equipped in Different Locations of Heat-supply Network for Power System with CHPs
CSTR:
Author:
Affiliation:

1.School of Electrical and Electronic Engineering, North China Electric Power University, Beijing, China;2.Department of Electrical Engineering, North China Electric Power University, Baoding, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Electric boilers (EBs) provide an alternative method to deal with the accommodation of curtailed wind power. To pursue the minimum coal consumption in the system, a dispatching model integrating combined-heat-and-power (CHP) plants and EBs in different locations is developed, and the penalty of wind power curtailment and cost of EB employment are also incorporated in the model. The transmission loss and transportation lag of heat-supply network as well as the elasticity of heat load are considered in this paper. A kind of constrained programming with stochastic and fuzzy parameters is applied to deal with the uncertainties. A case in East Inner Mongolia in China demonstrates that the EBs are able to absorb curtailed wind power and supply the heat. The results indicate that the utility of EBs in the primary or secondary heat-supply network to accommodate curtailed wind power is mainly related to the efficiency of heat transmission and the elasticity of heat load.

    Reference
    Related
    Cited by
Get Citation
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 09,2019
  • Revised:
  • Adopted:
  • Online: August 04,2021
  • Published:
Article QR Code